Reflection of
assignment
Golf ball holding tower
Members-Noshen, Aninda, Kartina&Nashita
Time given- 45 minutes
Assignment-
Build a tower that can hold golf balls and is capable to defend attacks or
forces.
1)
How well
did each member contribute and how?(all names including myself).
Explanation:- each member in our group for this
specific assignment was very delightful
and cooperative. Every member was assigned with a specific job and most of the
job was accomplished properly.
Name
|
Job
assigned
|
Aninda
|
Designer
|
Noshen
|
Main builder
|
Katrina
|
Time management person
|
Nashita
|
Material person
|
Aninda:-Aninda was
the designer of the tower. Everybody had some ideas about the structure. But
Aninda took all the ideas together and then modified them. By planning the
structure before building the tower was very helpful and it helped us to work
more organized. As we started building
the tower, we had to change the plan about certain sections. Then she drew the
plan in a big piece of paper. She also helped building the tower.
Noshen:- I was the
main builder of the tower. I built most of the tower and gave it a strong base.
I made the tower solid so, it could protect itself from attacks. I made the
tower long by adding blocks so, it was easy to make it tall faster.
Katrina:- Katrina
was the time management person. Her job was to keep
reminding the builder about the time and make sure that all the jobs are completed
by the deadline. For making it more organized, she divided up the time into
four different sections.
Planning(5min) Building(25min) Testing(10min) Emergency(5min)
In the beginning she
made sure to follow the plan but while we started building, she got more involved
for building than retaining the time. Although we were done before time, we got
late from handing in our tower.
Nashita:- Nashita was the material person and she was
very rapid for bringing the right material. She always picked the right
material. Therefore, we didn’t have to waste any of the materials.
2) Why you won or lost?
Explanation:-
Our group had a really strong structure with a moderate height but the main
reason for our team to lose was our time management and organization. Our group
was late to hand in the tower. Besides that, we had a very good chance of winning.
3) What
can you improve?
Explanation:- The main improvement needed for our team is time
management because, that was the main reason for our team for losing. We had a
very strong structured tower which was also tall. For being successful in the
future, we have to be swifter and more organized.